{"id":2828,"date":"2013-08-20T18:01:36","date_gmt":"2013-08-20T22:01:36","guid":{"rendered":"http:\/\/traceyarial.com\/blog\/?p=2828"},"modified":"2013-08-20T18:01:36","modified_gmt":"2013-08-20T22:01:36","slug":"eq8_quartier_angrignon","status":"publish","type":"post","link":"https:\/\/traceyarial.com\/blog\/en\/eq8_quartier_angrignon\/","title":{"rendered":"Construction of two more Quartier Angrignon towers underway"},"content":{"rendered":"<figure id=\"attachment_2829\" aria-describedby=\"caption-attachment-2829\" style=\"width: 485px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"2829\" data-permalink=\"https:\/\/traceyarial.com\/blog\/en\/eq8_quartier_angrignon\/cholette-eq8-144\/\" data-orig-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?fit=3742%2C2622&amp;ssl=1\" data-orig-size=\"3742,2622\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;5.6&quot;,&quot;camera&quot;:&quot;NIKON D700&quot;,&quot;created_timestamp&quot;:&quot;1371638319&quot;,&quot;focal_length&quot;:&quot;36&quot;,&quot;iso&quot;:&quot;400&quot;,&quot;shutter_speed&quot;:&quot;0.0025&quot;}\" data-image-title=\"cholette EQ8-144\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Robert Po\u00ebti, Michel Cholette, Manon Barbe and Georges Armoyan at the groundbreaking&lt;\/p&gt;\n\" data-large-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?fit=600%2C420&amp;ssl=1\" class=\" wp-image-2829     \" title=\"EQ8 Newman Allard\" alt=\"Quartier Angrignon\" src=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=485%2C340\" width=\"485\" height=\"340\" srcset=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?w=3742&amp;ssl=1 3742w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=150%2C105&amp;ssl=1 150w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=300%2C210&amp;ssl=1 300w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=600%2C420&amp;ssl=1 600w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=356%2C250&amp;ssl=1 356w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=285%2C200&amp;ssl=1 285w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=96%2C67&amp;ssl=1 96w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?w=2000&amp;ssl=1 2000w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?w=3000&amp;ssl=1 3000w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><figcaption id=\"caption-attachment-2829\" class=\"wp-caption-text\">Robert Po\u00ebti, Michel Cholette, Manon Barbe and Georges Armoyan at the groundbreaking<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/ville.montreal.qc.ca\/portal\/page?_pageid=9217,103485663&amp;_dad=portal&amp;_schema=PORTAL\" target=\"_blank\">LaSalle Borough<\/a> Councillors accepted $566,990 to establish a park on Allard Street at their July borough meeting. The payment is linked to the upcoming construction of two towers in Quartier Angrignon on a triangular lot bordered by Newman, Irwin and Allard.<\/p>\n<p>When completed, the two towers will form a \u201cv\u201d on the corner.\u00a0Together, they are the first phase of the \u201cEQ8 Cit\u00e9 Urbaine LaSalle\u201d transit- and pedestrian-oriented project.<\/p>\n<blockquote><p>We checked for the best site for this project and Ville de LaSalle is the one,\u201d says the general contractor for the project, Groupe Cholette\u2019s president Michel Cholette. \u201cIn most boroughs, it\u2019s a buyer\u2019s market. LaSalle is an exception. The demand is higher than what\u2019s available there.\u201d<\/p><\/blockquote>\n<p>While the official ground-breaking took place in the spring, construction on the first 169-unit tower will begin next month. Eighty-nine of the units will consist of four-and-a-half room condos. The others will include three-and-a-half room units and 1,600 square-foot five-and-a-half room units. The project will\u00a0cost $90 million to build.<\/p>\n<p>Owners Armco Capital Inc. had to begin spending before the plans for EQ8 were even started. It cost more than $10 million to truck away contaminated soil from the 35,907.6 square metre lot, which used to house a steel manufacturing plant.<\/p>\n<blockquote><p>The decommissioning of former industrial sites is a priority for Montreal, and we are pleased to be able to contribute in our own way,&#8221; said Armco\u2019s president Georges Armoyan.<\/p><\/blockquote>\n<p>As soon as the first 16-storey tower is sold, a second 15-storey tower will be built. Groupe Cholette had already sold about 50 of the units before groundbreaking through a consultation process that\u2019s been occurring while the lot was undergoing decontamination.<\/p>\n<blockquote><p>We put up an ad on the corner of the street, and when people would phone us or contact us by email, we conducted a bit of a focus group,\u201d said Stephane Chartrand, director of sales and international development\u00a0at\u00a0<a href=\"http:\/\/ca.linkedin.com\/company\/groupe-cholette?trk=ppro_cprof\" target=\"_blank\">Groupe Cholette<\/a>. \u201cWe\u2019ve spoken to more than 200 people, and met with about a hundred of them. We\u2019ve really listened.\u201d<\/p><\/blockquote>\n<p>Chartrand says that the size of the units was very important to the people they interviewed, as were larger balconies. Some units even have very large terraces to satisfy demand. An indoor pool was less important to most of them and won\u2019t be included.<\/p>\n<blockquote><p>Some of the people we spoke to have lived in LaSalle all their life and they want to move out of triplexes and duplexes. Others are from the south shore and they\u2019re tired of crossing the Champlain Bridge.\u201d<\/p><\/blockquote>\n<p>Cholette is working with St. Laurent-based architect Rabih Khazaka, who will be designing an impressive water wall to face the building. He\u2019ll design based on the \u201cEQ8\u201d concept that stands for balancing eight elements to achieve equilibrium: urban and suburban lifestyles, the bubbling water of the St. Lawrence rapids and the smooth water of the Lachine Canal, Angrignon Park tranquility and Angrignon Mall shopping effervescence, and the fragility of glass with the strength of concrete.<\/p>\n<p>The project isn\u2019t registered for the LEEDs program, but there are environmental aspects to it, including a ratio of only one car per unit and an in-building car-sharing service run by LibrOto company (<a href=\"http:\/\/en.libroto.ca\/\">http:\/\/en.libroto.ca<\/a>) president and founder Christian Assouad.<\/p>\n<blockquote><p>There will be parking spaces for buyers who choose to join the services\u201420 or 30 customers,\u201d said Chartrand. \u201cThe Montreal-based company has a couple of cars out. It\u2019s an hourly rate service. Access will be through the same key as for the building.\u201d<\/p><\/blockquote>\n<p><span style=\"color: #993300;\">Note: A version of this article appeared on page two of the Suburban City Edition on Wednesday, August 14, 2013.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; LaSalle Borough Councillors accepted $566,990 to establish a park on Allard Street at their July borough meeting. The payment is linked to the upcoming construction of two towers in Quartier Angrignon on a triangular lot bordered by Newman, Irwin and Allard. When completed, the two towers will form a \u201cv\u201d on the corner.\u00a0Together, they [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_wp_convertkit_post_meta":{"form":"-1","landing_page":"0","tag":"0","restrict_content":"0"},"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[23],"tags":[],"class_list":["post-2828","post","type-post","status-publish","format-standard","hentry","category-lasalleposts","post-wrapper","thrv_wrapper"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2buQs-JC","jetpack-related-posts":[{"id":15962,"url":"https:\/\/traceyarial.com\/blog\/en\/construction-contracts-chips\/","url_meta":{"origin":2828,"position":0},"title":"Construction, contracts and chips in LaSalle","author":"Tracey Arial","date":"October 14, 2014","format":false,"excerpt":"Seven construction projects, two contracts, the Library\u2019s \u201cReading\u2019s Worth It\u201d project, a new Place Ross-Blackhurst in Riverside Park and a discussion about chips and IGA wine were among the key features at the LaSalle Borough Meeting\u00a0last\u00a0Monday, October 6. Construction on Allard, Centrale, 39th, L\u00e9ger, Bois des Caryers and LaSalle Heights\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":3022,"url":"https:\/\/traceyarial.com\/blog\/en\/manon-barbe\/","url_meta":{"origin":2828,"position":1},"title":"LaSalle Candidate for Mayor (incumbent): Manon Barbe","author":"Tracey Arial","date":"October 22, 2013","format":false,"excerpt":"Association: \u00c9quipe Barbe Team - Pro action LaSalle, http:\/\/www.equipebarbeteam.ca\/ Candidate office: 1513, avenue Dollard Current LaSalle mayor Manon Barbe has served as mayor of her borough since 2003. She also served as city council for the previous city from 1995 until 2001 and then president of the borough from 2001\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"Manon Barbe photo","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-10-18-04-07-17-Barbe-petite-283x300.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":16287,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalle-development-feb16\/","url_meta":{"origin":2828,"position":2},"title":"Three LaSalle deadlines this week","author":"Tracey Arial","date":"February 16, 2015","format":false,"excerpt":"There are three deadlines this week, February 16, for citizens interested in LaSalle development. Wednesday, February 18\u00a0at 7 p.m., a consultation will take place at 55 avenue Dupras, LaSalle about a renewal of the site located at 8591-8597, rue Centrale where Monsieur Depanneur is located. Plans include expanding the existing\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":16092,"url":"https:\/\/traceyarial.com\/blog\/en\/balconies-bricks-exterior-sheeting-lasalle\/","url_meta":{"origin":2828,"position":3},"title":"Balconies, bricks and exterior sheeting in LaSalle","author":"Tracey Arial","date":"November 13, 2014","format":false,"excerpt":"Why does the colour of brick matter so much? That was essentially the question Simon-Pierre Labelle, the president of Developement Immobilier Newman Inc. posed to Mayor Manon Barbe at the end of the November council meeting. Labelle\u2019s project at 1771 blvd. Angrignon has been stalled since June because the colour\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"WP_20141103_001","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/WP_20141103_001-336x600.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":15934,"url":"https:\/\/traceyarial.com\/blog\/en\/bois-de-caryer-revived\/","url_meta":{"origin":2828,"position":4},"title":"Bois de Caryer Revived","author":"Tracey Arial","date":"September 24, 2014","format":false,"excerpt":"Thanks to a new developer, all the people who deposited $40,500 for units in the Bois de Caryer neighbourhood in LaSalle will get the home of their dreams or their life savings back. There\u2019s no way I\u2019m going to start a project with 97 people losing their life savings,\u201d said\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"9261140001_Utopia_Persp_Ext_CourtYard-jour_v01","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/9261140001_Utopia_Persp_Ext_CourtYard-jour_v01-600x400.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/9261140001_Utopia_Persp_Ext_CourtYard-jour_v01-600x400.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/9261140001_Utopia_Persp_Ext_CourtYard-jour_v01-600x400.jpg?resize=525%2C300 1.5x"},"classes":[]},{"id":2857,"url":"https:\/\/traceyarial.com\/blog\/en\/quartier_21_lasalle\/","url_meta":{"origin":2828,"position":5},"title":"Executive Committee Approves Quartier 21 LaSalle","author":"Tracey Arial","date":"September 4, 2013","format":false,"excerpt":"LaSalle\u2019s social development round-table organization will receive funding under the Quartier 21 project for the period from January 1, 2014 until December 31, 2017. \u201cWe are very proud to have been chosen by Quartier 21 and we have been working very hard to come up with a project that will\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/2828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/comments?post=2828"}],"version-history":[{"count":4,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/2828\/revisions"}],"predecessor-version":[{"id":2833,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/2828\/revisions\/2833"}],"wp:attachment":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/media?parent=2828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/categories?post=2828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/tags?post=2828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}