{"id":16628,"date":"2015-10-07T09:37:54","date_gmt":"2015-10-07T13:37:54","guid":{"rendered":"http:\/\/traceyarial.com\/blog\/?p=16628"},"modified":"2015-10-07T09:38:43","modified_gmt":"2015-10-07T13:38:43","slug":"wanklyn-consultation-tuesday","status":"publish","type":"post","link":"https:\/\/traceyarial.com\/blog\/en\/wanklyn-consultation-tuesday\/","title":{"rendered":"Wanklyn consultation Tuesday"},"content":{"rendered":"<figure id=\"attachment_322\" aria-describedby=\"caption-attachment-322\" style=\"width: 573px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"322\" data-permalink=\"https:\/\/traceyarial.com\/blog\/en\/merlin-immobilier-lowers-height-of-buildings-in-proposed-wanklyn-project\/wanklynoverview\/\" data-orig-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?fit=573%2C383&amp;ssl=1\" data-orig-size=\"573,383\" data-comments-opened=\"1\" data-image-title=\"Wanklyn Overview\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Architectural drawings of Merlin&amp;#8217;s original plans&lt;\/p&gt;\n\" data-large-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?fit=573%2C383&amp;ssl=1\" class=\"size-full wp-image-322\" src=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=573%2C383\" alt=\"Architectural view of Wanklyn\" width=\"573\" height=\"383\" srcset=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?w=573&amp;ssl=1 573w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=150%2C100&amp;ssl=1 150w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=300%2C200&amp;ssl=1 300w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=374%2C250&amp;ssl=1 374w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=299%2C200&amp;ssl=1 299w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=96%2C64&amp;ssl=1 96w\" sizes=\"auto, (max-width: 573px) 100vw, 573px\" \/><\/a><figcaption id=\"caption-attachment-322\" class=\"wp-caption-text\">Architectural drawings of Merlin&#8217;s original plans<\/figcaption><\/figure>\n<p>If you want to participate in the public consultations about the Wanklyn development next week, you must make an appointment with Gilles V\u00e9zina at (514) 872-8510 today or tomorrow.<\/p>\n<p>The hearings will be held next Tuesday night, October 13 beginning at 7 p.m. at the Sofia reception centre, 420 Avenue Lafleur in LaSalle.<\/p>\n<p>V\u00e9zina says that submissions in English are welcome, so please do so. Although residents who participated in the information session on September 15 who asked questions in English were given answers in French, the commissioners are capable of understanding English presentations.<\/p>\n<p>The Wanklyn project is a residential development to take place on the old TransContinental printing plant property and adjacent lands. The entire project concerns 47,139 square metres between Cherry Lane, Jean-Milot, Wanklyn and Highway 138.<\/p>\n<p>The owner, <em>The Fonds immobilier de solidarit\u00e9 FTQ,<\/em> proposes to build 786 units and a park on the site, including 119 units for people with low and moderate incomes, 230 units for first-time buyers who need government assistance to purchase a condo, and 437 rentals, condos and\/or seniors\u2019 units.<\/p>\n<p>The hearings are the second step in a consultation led by Montreal\u2019s public consultation office (<em>Office de consultation publique de Montreal<\/em>\u00a0 or OCPM).<\/p>\n<p>Three commissioners will hear submissions: Bruno Bergeron, who participated in developing the Vincent d\u2019Indy de Boucherville Park; Arlindo Vieira, who was behind a report about the under-representation of minorities in the public service when he led the Conseil des relations interculturelles; and Luba Serge, a specialist in analyzing social housing.<\/p>\n<p>Submissions about the project from the developer and the borough of LaSalle are located at <a href=\"http:\/\/ocpm.qc.ca\/ilot-wanklyn\">http:\/\/ocpm.qc.ca\/ilot-wanklyn<\/a>. Borough submissions a copy of the borough\u2019s zoning, architectural bylaws and housing strategy; a copy of Montreal\u2019s master urban plan and a copy of the regional agglomeration master development plan.<\/p>\n<p>Despite the obvious link between this development and that of the agglomeration, the OCPM is also hearing submissions about the agglomeration development plan Tuesday night at 7 p.m.<\/p>\n<p>Anyone interested in both developments must pick the one they care about most, something that particularly frustrates Sonja Susnjar, the activist who ensured that citizens knew how to reject two previous Wanklyn proposals for development in 2011 and 2012.<\/p>\n<figure id=\"attachment_346\" aria-describedby=\"caption-attachment-346\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"346\" data-permalink=\"https:\/\/traceyarial.com\/blog\/en\/merlin-immobilier-lowers-height-of-buildings-in-proposed-wanklyn-project\/wanklynbylawrevisionnew\/\" data-orig-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg?fit=300%2C205&amp;ssl=1\" data-orig-size=\"300,205\" data-comments-opened=\"1\" data-image-title=\"Wanklyn Height Revision\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Revised Architectural Drawings, May 4, 2012&lt;\/p&gt;\n\" data-large-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg?fit=300%2C205&amp;ssl=1\" class=\"size-full wp-image-346\" src=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg?resize=300%2C205\" alt=\"Revised Wanklyn drawings\" width=\"300\" height=\"205\" srcset=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg?w=300&amp;ssl=1 300w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg?resize=150%2C102&amp;ssl=1 150w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg?resize=292%2C200&amp;ssl=1 292w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynBylawRevisionnew.jpg?resize=96%2C65&amp;ssl=1 96w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-346\" class=\"wp-caption-text\">Revised Architectural Drawings, May 4, 2012<\/figcaption><\/figure>\n<blockquote><p>Everyone who lives in this enclave knows that expansive development in this area will lead to more gridlock than we already have,\u201d said Susnjar. \u201cThere are no active transportation options in this area. I once tried to get to NDG by public transport and it took two and a half hours. If local citizens have a real say, this project won\u2019t happen.\u201d<\/p><\/blockquote>\n<p>Previous stories are at:<\/p>\n<p><a href=\"http:\/\/traceyarial.com\/blog\/wanklyn\/\">http:\/\/traceyarial.com\/blog\/wanklyn\/<\/a>,<\/p>\n<p><a href=\"http:\/\/traceyarial.com\/blog\/sirens-wanklyn\/\">http:\/\/traceyarial.com\/blog\/sirens-wanklyn\/<\/a>,<\/p>\n<p><a href=\"http:\/\/traceyarial.com\/blog\/referendum-or-revision-for-wanklyn-project\/\">http:\/\/traceyarial.com\/blog\/referendum-or-revision-for-wanklyn-project\/<\/a>,<\/p>\n<p><a href=\"http:\/\/traceyarial.com\/blog\/lasalle-borough-approves-wanklyn-vote-hospital-expansion-public-consultation-and-building-modifications\/\">http:\/\/traceyarial.com\/blog\/lasalle-borough-approves-wanklyn-vote-hospital-expansion-public-consultation-and-building-modifications\/<\/a>,<\/p>\n<p><a href=\"http:\/\/traceyarial.com\/blog\/lasalle-borough-sets-june-21-for-register-about-wanklyn-island-zone-changes-if-needed\/\">http:\/\/traceyarial.com\/blog\/lasalle-borough-sets-june-21-for-register-about-wanklyn-island-zone-changes-if-needed\/<\/a>, and<\/p>\n<p><a href=\"http:\/\/traceyarial.com\/blog\/merlin-immobilier-lowers-height-of-buildings-in-proposed-wanklyn-project\/\">http:\/\/traceyarial.com\/blog\/merlin-immobilier-lowers-height-of-buildings-in-proposed-wanklyn-project\/<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you want to participate in the public consultations about the Wanklyn development next week, you must make an appointment with Gilles V\u00e9zina at (514) 872-8510 today or tomorrow. The hearings will be held next Tuesday night, October 13 beginning at 7 p.m. at the Sofia reception centre, 420 Avenue Lafleur in LaSalle. V\u00e9zina says [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_wp_convertkit_post_meta":{"form":"-1","landing_page":"0","tag":"0","restrict_content":"0"},"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[23],"tags":[771,245,741,724,96,750,451,772,723],"class_list":["post-16628","post","type-post","status-publish","format-standard","hentry","category-lasalleposts","tag-development","tag-ftq","tag-lasalle-2","tag-merlin","tag-montreal","tag-ocpm","tag-public-consultation","tag-tod","tag-wanklyn","post-wrapper","thrv_wrapper"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2buQs-4kc","jetpack-related-posts":[{"id":16599,"url":"https:\/\/traceyarial.com\/blog\/en\/wanklyn\/","url_meta":{"origin":16628,"position":0},"title":"Wanklyn consultation now underway","author":"Tracey Arial","date":"September 10, 2015","format":false,"excerpt":"This month, Montreal\u2019s public consultation office (Office de consultation publique de Montreal\u00a0 or OCPM) begins holding hearings into the residential project to be constructed on a 47,139-square-metre triangular property between Cherry Lane, Jean-Milot, Wanklyn and Highway 138 in LaSalle. The owner, The Fonds immobilier de solidarit\u00e9 FTQ, prop oses to\u2026","rel":"","context":"In &quot;Island Report&quot;","block_context":{"text":"Island Report","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/island-report\/"},"img":{"alt_text":"2015project","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":16573,"url":"https:\/\/traceyarial.com\/blog\/en\/sirens-wanklyn\/","url_meta":{"origin":16628,"position":1},"title":"Sirens and Wanklyn","author":"Tracey Arial","date":"June 4, 2015","format":false,"excerpt":"The Labatt Brewery in LaSalle was one of six Montreal companies to\u00a0test their emergency sirens this afternoon. I'm too far away to hear them, but if anyone else did, I'd love to know what happened. The tests are designed to train people to protect themselves from explosions and possible toxic\u2026","rel":"","context":"In &quot;Journalism&quot;","block_context":{"text":"Journalism","link":"https:\/\/traceyarial.com\/blog\/en\/category\/writing\/notable-nonfiction\/journalism\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynZonechange.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":439,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalle-borough-sets-june-21-for-register-about-wanklyn-island-zone-changes-if-needed\/","url_meta":{"origin":16628,"position":2},"title":"Lasalle Borough Sets June 21 for Register about Wanklyn Island Zone Changes, If Needed","author":"Tracey Arial","date":"May 17, 2012","format":false,"excerpt":"During the question period at their borough meeting on May 7, LaSalle Borough officials said that the proposed bylaw for three lots won\u2019t change, despite Merlin Immobilier\u2019s decision to lower the height of their buildings in their two projects. \u201cWe aren\u2019t changing the bylaw, but we are changing the heights\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynZonechange.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":573,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalle-borough-approves-wanklyn-vote-hospital-expansion-public-consultation-and-building-modifications\/","url_meta":{"origin":16628,"position":3},"title":"LaSalle Borough Approves Wanklyn Vote, Hospital Expansion, Public Consultation and Building Modifications","author":"Tracey Arial","date":"June 7, 2012","format":false,"excerpt":"If 65 people sign a register at City Hall between 9 a.m. and 7 p.m. on Thursday, June 21, the Wanklyn project will face a referendum, a reinvention or it could be halted entirely.\u00a0 The rules for the register and referendum, if needed, are overseen by Quebec\u2019s Chief Electoral Officer\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynZonechange.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":317,"url":"https:\/\/traceyarial.com\/blog\/en\/merlin-immobilier-lowers-height-of-buildings-in-proposed-wanklyn-project\/","url_meta":{"origin":16628,"position":4},"title":"Merlin Immobilier Lowers Height of Buildings in Proposed Wanklyn Project","author":"Tracey Arial","date":"May 3, 2012","format":false,"excerpt":"LaSalle\u2014Merlin Immobilier decided to lower the height of some of the buildings in its proposed Wanklyn project yesterday to ensure that LaSalle residents don\u2019t block the rezoning of the 47,139-square-metre Fonds immobilier de solidarit\u00e9 property between Cherry Lane, Jean-Milot, Wanklyn and Highway 138. Proposed 12-storey buildings will be adjusted to\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"Architectural view of Wanklyn","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":17075,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalle-withdraws-wanklyn-rail-line-projects\/","url_meta":{"origin":16628,"position":5},"title":"LaSalle withdraws Wanklyn and Rail line projects","author":"Tracey Arial","date":"April 6, 2016","format":false,"excerpt":"During their recent meeting, the LaSalle borough council withdrew their support for a rail line zone change, a decision that acting mayor Nancy Blanchette said was made the same morning. Read the rest of the story in today's Suburban. It also appeared on page A6 of the City print edition.","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/16628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/comments?post=16628"}],"version-history":[{"count":2,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/16628\/revisions"}],"predecessor-version":[{"id":16630,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/16628\/revisions\/16630"}],"wp:attachment":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/media?parent=16628"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/categories?post=16628"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/tags?post=16628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}