{"id":16599,"date":"2015-09-10T12:36:59","date_gmt":"2015-09-10T16:36:59","guid":{"rendered":"http:\/\/traceyarial.com\/blog\/?p=16599"},"modified":"2015-09-10T12:36:59","modified_gmt":"2015-09-10T16:36:59","slug":"wanklyn","status":"publish","type":"post","link":"https:\/\/traceyarial.com\/blog\/en\/wanklyn\/","title":{"rendered":"Wanklyn consultation now underway"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"16600\" data-permalink=\"https:\/\/traceyarial.com\/blog\/en\/wanklyn\/2015project\/\" data-orig-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?fit=444%2C184&amp;ssl=1\" data-orig-size=\"444,184\" data-comments-opened=\"1\" data-image-title=\"2015project\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?fit=444%2C184&amp;ssl=1\" class=\"aligncenter wp-image-16600 size-full\" src=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?resize=444%2C184\" alt=\"2015project\" width=\"444\" height=\"184\" srcset=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?w=444&amp;ssl=1 444w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?resize=150%2C62&amp;ssl=1 150w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?resize=300%2C124&amp;ssl=1 300w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg?resize=96%2C40&amp;ssl=1 96w\" sizes=\"auto, (max-width: 444px) 100vw, 444px\" \/><\/p>\n<p>This month, Montreal\u2019s public consultation office (<em>Office de consultation publique de Montreal<\/em>\u00a0 or OCPM) begins holding hearings into the residential project to be constructed on a 47,139-square-metre triangular property between Cherry Lane, Jean-Milot, Wanklyn and Highway 138 in LaSalle.<\/p>\n<p>The owner, <em>The Fonds immobilier de solidarit\u00e9 FTQ,<\/em> prop<a href=\"http:\/\/traceyarial.com\/blog\/wp-content\/uploads\/2015project.jpg\"><br \/>\n<\/a>oses to build 786 units and a park on the site, including 119 units for people with low and moderate incomes, 230 units for first-time buyers who need government assistance to purchase a condo, and 437 rentals, condos and\/or seniors\u2019 units.<\/p>\n<p>The office will hold an information session about the project on Tuesday, September 15 at 7 p.m. at the Sofia reception centre, 420 Avenue Lafleur in LaSalle.<\/p>\n<p>Three commissioners have been appointed to conduct the consultations. They are: Bruno Bergeron, who participated in developing the Vincent d\u2019Indy de Boucherville Park; Arlindo Vieira, who was behind a report about the under-representation of minorities in the public service when he led the Conseil des relations interculturelles; and Luba Serge, a specialist in analyzing social housing.<\/p>\n<p>Anyone who wants to submit comments or recommendations about the project will be able to do so on Tuesday, October 13 in the same location at 7 p.m. To do so, however, they must make an appointment with Gilles V\u00e9zina at (514) 872-8510 prior to, or on, October 8.<\/p>\n<p>Several LaSalle residents will probably participate in the hearings. The current project is essentially the same as one rejected by local citizens in 2012 due to concerns about traffic, parking, snow-clearing and noise. The developer submitted several reports about these issues to commissioners.<\/p>\n<p>The borough of LaSalle also submitted its own reports about the project, including a copy of the borough\u2019s zoning, architectural bylaws and housing strategy; a copy of Montreal\u2019s master urban plan and a copy of the regional agglomeration master development plan.<\/p>\n<p>Ironically, the OCPM is holding hearings into Montreal\u2019s regional development plan on the same evening (October 13) as their Wanklyn consultation. Anyone who wants to present a brief about Wanklyn will not be able to follow or participate in hearings about the overall regional plan.<\/p>\n<p>The Wanklyn consultation is outlined on the OCPM website at <a href=\"http:\/\/ocpm.qc.ca\/node\/4287\">http:\/\/ocpm.qc.ca\/node\/4287<\/a> and the documents about the project are located at <a href=\"http:\/\/ocpm.qc.ca\/ilot-wanklyn\">http:\/\/ocpm.qc.ca\/ilot-wanklyn<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This month, Montreal\u2019s public consultation office (Office de consultation publique de Montreal\u00a0 or OCPM) begins holding hearings into the residential project to be constructed on a 47,139-square-metre triangular property between Cherry Lane, Jean-Milot, Wanklyn and Highway 138 in LaSalle. The owner, The Fonds immobilier de solidarit\u00e9 FTQ, prop oses to build 786 units and a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_wp_convertkit_post_meta":{"form":"-1","landing_page":"0","tag":"0","restrict_content":"0"},"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[21,23],"tags":[759,758,751,755,760,754,245,753,752,757,741,761,96,750,749,748,472,756,723],"class_list":["post-16599","post","type-post","status-publish","format-standard","hentry","category-island-report","category-lasalleposts","tag-arlindo-vieira","tag-bruno-bergeron","tag-cherry-lane","tag-condos","tag-conseil-des-relations-interculturelles","tag-fonds-immobilier-de-solidarite","tag-ftq","tag-highway","tag-jean-milot","tag-lafleur","tag-lasalle-2","tag-luba-serge","tag-montreal","tag-ocpm","tag-office-de-consultation-publique-de-montreal","tag-public-consultation-office","tag-social-housing-2","tag-sofia-reception-centre","tag-wanklyn","post-wrapper","thrv_wrapper"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/s2buQs-wanklyn","jetpack-related-posts":[{"id":16628,"url":"https:\/\/traceyarial.com\/blog\/en\/wanklyn-consultation-tuesday\/","url_meta":{"origin":16599,"position":0},"title":"Wanklyn consultation Tuesday","author":"Tracey Arial","date":"October 7, 2015","format":false,"excerpt":"If you want to participate in the public consultations about the Wanklyn development next week, you must make an appointment with Gilles V\u00e9zina at (514) 872-8510 today or tomorrow. The hearings will be held next Tuesday night, October 13 beginning at 7 p.m. at the Sofia reception centre, 420 Avenue\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"Architectural view of Wanklyn","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=525%2C300 1.5x"},"classes":[]},{"id":16573,"url":"https:\/\/traceyarial.com\/blog\/en\/sirens-wanklyn\/","url_meta":{"origin":16599,"position":1},"title":"Sirens and Wanklyn","author":"Tracey Arial","date":"June 4, 2015","format":false,"excerpt":"The Labatt Brewery in LaSalle was one of six Montreal companies to\u00a0test their emergency sirens this afternoon. I'm too far away to hear them, but if anyone else did, I'd love to know what happened. The tests are designed to train people to protect themselves from explosions and possible toxic\u2026","rel":"","context":"In &quot;Journalism&quot;","block_context":{"text":"Journalism","link":"https:\/\/traceyarial.com\/blog\/en\/category\/writing\/notable-nonfiction\/journalism\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynZonechange.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":317,"url":"https:\/\/traceyarial.com\/blog\/en\/merlin-immobilier-lowers-height-of-buildings-in-proposed-wanklyn-project\/","url_meta":{"origin":16599,"position":2},"title":"Merlin Immobilier Lowers Height of Buildings in Proposed Wanklyn Project","author":"Tracey Arial","date":"May 3, 2012","format":false,"excerpt":"LaSalle\u2014Merlin Immobilier decided to lower the height of some of the buildings in its proposed Wanklyn project yesterday to ensure that LaSalle residents don\u2019t block the rezoning of the 47,139-square-metre Fonds immobilier de solidarit\u00e9 property between Cherry Lane, Jean-Milot, Wanklyn and Highway 138. Proposed 12-storey buildings will be adjusted to\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"Architectural view of Wanklyn","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":439,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalle-borough-sets-june-21-for-register-about-wanklyn-island-zone-changes-if-needed\/","url_meta":{"origin":16599,"position":3},"title":"Lasalle Borough Sets June 21 for Register about Wanklyn Island Zone Changes, If Needed","author":"Tracey Arial","date":"May 17, 2012","format":false,"excerpt":"During the question period at their borough meeting on May 7, LaSalle Borough officials said that the proposed bylaw for three lots won\u2019t change, despite Merlin Immobilier\u2019s decision to lower the height of their buildings in their two projects. \u201cWe aren\u2019t changing the bylaw, but we are changing the heights\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynZonechange.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":573,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalle-borough-approves-wanklyn-vote-hospital-expansion-public-consultation-and-building-modifications\/","url_meta":{"origin":16599,"position":4},"title":"LaSalle Borough Approves Wanklyn Vote, Hospital Expansion, Public Consultation and Building Modifications","author":"Tracey Arial","date":"June 7, 2012","format":false,"excerpt":"If 65 people sign a register at City Hall between 9 a.m. and 7 p.m. on Thursday, June 21, the Wanklyn project will face a referendum, a reinvention or it could be halted entirely.\u00a0 The rules for the register and referendum, if needed, are overseen by Quebec\u2019s Chief Electoral Officer\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynZonechange.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":605,"url":"https:\/\/traceyarial.com\/blog\/en\/referendum-or-revision-for-wanklyn-project\/","url_meta":{"origin":16599,"position":5},"title":"Wanklyn Project Set Aside","author":"Tracey Arial","date":"July 6, 2012","format":false,"excerpt":"The LaSalle Borough has set aside the Wanklyn Project after 107\u00a0local residents signed a registry to ask for a referendum to approve it. This was 19.7% of those eligible to vote. Mayor Manon Barbe announced the decision at a council meeting on Tuesday, July 3. During her speech, she made\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"Architectural view of Wanklyn","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2012\/05\/WanklynOverview-300x200.jpg?resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/16599","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/comments?post=16599"}],"version-history":[{"count":1,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/16599\/revisions"}],"predecessor-version":[{"id":16601,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/16599\/revisions\/16601"}],"wp:attachment":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/media?parent=16599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/categories?post=16599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/tags?post=16599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}