{"id":1599,"date":"2013-05-12T08:11:44","date_gmt":"2013-05-12T12:11:44","guid":{"rendered":"http:\/\/traceyarial.com\/blog\/?p=1599"},"modified":"2013-05-10T07:18:04","modified_gmt":"2013-05-10T11:18:04","slug":"raytownsend","status":"publish","type":"post","link":"https:\/\/traceyarial.com\/blog\/en\/raytownsend\/","title":{"rendered":"Wood-frame multi-family rentals priority for Edmonton says Townsend"},"content":{"rendered":"<p><a href=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"1692\" data-permalink=\"https:\/\/traceyarial.com\/blog\/en\/raytownsend\/woodframe\/\" data-orig-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?fit=260%2C315&amp;ssl=1\" data-orig-size=\"260,315\" data-comments-opened=\"1\" data-image-title=\"woodframe\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?fit=260%2C315&amp;ssl=1\" class=\"aligncenter size-medium wp-image-1692\" alt=\"Edmonton woodframe\" src=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe-247x300.jpg?resize=247%2C300\" width=\"247\" height=\"300\" srcset=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?resize=247%2C300&amp;ssl=1 247w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?resize=123%2C150&amp;ssl=1 123w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?resize=206%2C250&amp;ssl=1 206w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?resize=165%2C200&amp;ssl=1 165w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?resize=79%2C96&amp;ssl=1 79w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/woodframe.jpg?w=260&amp;ssl=1 260w\" sizes=\"auto, (max-width: 247px) 100vw, 247px\" \/><\/a><\/p>\n<p>There\u2019s been a lot of talk about high-density construction in Edmonton now that the arena is getting underway, but four-storey wood-framed housing for families are needed now.<\/p>\n<p>\u201cThere\u2019s a massive appetite for brand new multi-family product,\u201d says Raymond Townsend, senior vice president of CB Richard Ellis Limited. \u201cThose people who have gone out and built brand new four-storey multi-family purpose-built rental, they\u2019re finding, on occupancy permit or shortly after, they\u2019re one hundred percent leased.\u201d<\/p>\n<p>What happens in the industrial market is key, he says, and Edmonton\u2019s real estate market revives as the region attains fabrication jobs from Fort McMurray. \u201cWhen the industrial market does very well, all other markets seem to do well. The kind of housing here is driven by a blue collar market.\u201d<\/p>\n<p>Townsend believes that the condo market will have little or no influence on the rental market over the next year or so, other than offering newer product for rent.<\/p>\n<p>Although Townsend believes that the industry will support the vision for the arena district once it gets underway, he sees few possibilities for high-density construction. Rare successes include the new 237-unit 16-storey new concrete Mayfair Village project by Procura, but that was subsidized. Land values don\u2019t otherwise support the prohibitive cost of concrete and steel construction and zoning regulations prevent wood-frame projects higher than four storeys.<\/p>\n<p>\u201cIf they change the requirements and allow for six-storey wood-frames, then the density will increase.\u201d<\/p>\n<p>Note: This article appeared on p50 of the Spring 2013 Real Estate Forum magazine, which can be read in it&#8217;s totality at:\u00a0<a href=\"http:\/\/www.realestateforums.com\/crefm\/docs\/!_REF_SPRING_2013_Montreal.pdf\">http:\/\/www.realestateforums.com\/crefm\/docs\/!_REF_SPRING_2013_Montreal.pdf<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>There\u2019s been a lot of talk about high-density construction in Edmonton now that the arena is getting underway, but four-storey wood-framed housing for families are needed now. \u201cThere\u2019s a massive appetite for brand new multi-family product,\u201d says Raymond Townsend, senior vice president of CB Richard Ellis Limited. \u201cThose people who have gone out and built [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_wp_convertkit_post_meta":{"form":"-1","landing_page":"0","tag":"0","restrict_content":"0"},"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[30],"tags":[],"class_list":["post-1599","post","type-post","status-publish","format-standard","hentry","category-canada","post-wrapper","thrv_wrapper"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2buQs-pN","jetpack-related-posts":[{"id":15675,"url":"https:\/\/traceyarial.com\/blog\/en\/commercial_real-estate\/","url_meta":{"origin":1599,"position":0},"title":"Canadian Commerical Real Estate Mostly Healthy","author":"Tracey Arial","date":"May 12, 2014","format":false,"excerpt":"Other than potential saturations in the office markets in Toronto, Edmonton and perhaps Montreal, the fundamentals for commercial real estate in Canada are strong. So says Michael Dal Bello, an investment partner at Pritzker Group Private Capital. The fundamentals are very good in Edmonton, in terms of industrial, retail, and\u2026","rel":"","context":"In &quot;Canada&quot;","block_context":{"text":"Canada","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":15678,"url":"https:\/\/traceyarial.com\/blog\/en\/edmonton-development-disconnect\/","url_meta":{"origin":1599,"position":1},"title":"Edmonton\u2019s Development Disconnect","author":"Tracey Arial","date":"May 15, 2014","format":false,"excerpt":"While other cities face residential land shortages and struggle against urban sprawl, Edmonton\u2019s transportation system ensures access to surrounding municipalities that compete to attract developers. We\u2019ve just built a ring road that\u2019s approximately ten miles in all directions from the downtown core,\u201d said Greg Christenson, a senior housing developer in\u2026","rel":"","context":"In &quot;Canada&quot;","block_context":{"text":"Canada","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":15670,"url":"https:\/\/traceyarial.com\/blog\/en\/edmonton_retailers\/","url_meta":{"origin":1599,"position":2},"title":"Edmonton Retailers Thrive, Despite Challenges","author":"Tracey Arial","date":"May 17, 2014","format":false,"excerpt":"If they can even find a location to rent, retailers in Edmonton can expect to pay high rents driven by constriction costs that are typically 40% higher than other markets. Despite these challenges, the market is well-worth entering, says Brett Killips, an associate partner with Cushman & Wakefield. Those who\u2026","rel":"","context":"In &quot;Canada&quot;","block_context":{"text":"Canada","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/"},"img":{"alt_text":"Killips, Brett(1)","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/Killips-Brett1.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1882,"url":"https:\/\/traceyarial.com\/blog\/en\/mid-size-market-opportunities\/","url_meta":{"origin":1599,"position":3},"title":"Mid-size Market Opportunities via growth, creativity and services","author":"Tracey Arial","date":"November 29, 2012","format":false,"excerpt":"Many of the assets in our market have potential to add more density, as planners become more open to the infilling concept says Manitoban real estate expert Mid-size markets in the west are growing briskly, says Sandy Shindleman, president of Shindico Group, a commercial-based real estate investor based in Winnipeg.\u2026","rel":"","context":"In &quot;Canada&quot;","block_context":{"text":"Canada","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/"},"img":{"alt_text":"Shindleman headshot","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/Shindleman.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2828,"url":"https:\/\/traceyarial.com\/blog\/en\/eq8_quartier_angrignon\/","url_meta":{"origin":1599,"position":4},"title":"Construction of two more Quartier Angrignon towers underway","author":"Tracey Arial","date":"August 20, 2013","format":false,"excerpt":"\u00a0 LaSalle Borough Councillors accepted $566,990 to establish a park on Allard Street at their July borough meeting. The payment is linked to the upcoming construction of two towers in Quartier Angrignon on a triangular lot bordered by Newman, Irwin and Allard. When completed, the two towers will form a\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"Quartier Angrignon","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":16526,"url":"https:\/\/traceyarial.com\/blog\/en\/social-housing-pie-x\/","url_meta":{"origin":1599,"position":5},"title":"Quebec funds social housing on Pie-X","author":"Tracey Arial","date":"April 21, 2015","format":false,"excerpt":"The project to tear down the old Notre-Dame-Lourdes school on Pie-X in Chomedey and build a four-storey 67-unit social housing complex is one step closer to reality. We learned this morning that the Soci\u00e9t\u00e9 d'habitation du Qu\u00e9bec (SHQ) has reserved 67 units for a project on Pix X,\u201d said Nicholas\u2026","rel":"","context":"In &quot;Hundred Mile Circle&quot;","block_context":{"text":"Hundred Mile Circle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/hundredmilecircle\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/1599","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/comments?post=1599"}],"version-history":[{"count":5,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/1599\/revisions"}],"predecessor-version":[{"id":1695,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/1599\/revisions\/1695"}],"wp:attachment":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/media?parent=1599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/categories?post=1599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/tags?post=1599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}