{"id":15528,"date":"2014-04-17T07:26:47","date_gmt":"2014-04-17T11:26:47","guid":{"rendered":"http:\/\/traceyarial.com\/blog\/?p=15528"},"modified":"2014-04-19T09:19:22","modified_gmt":"2014-04-19T13:19:22","slug":"crestview-decontaminated","status":"publish","type":"post","link":"https:\/\/traceyarial.com\/blog\/en\/crestview-decontaminated\/","title":{"rendered":"Crestview Environmental Report Underway"},"content":{"rendered":"<p>After reading about the damaged heating tank and the decontamination at Crestview last summer, someone with a child at the school contacted the Suburban to ask whether the school is safe. This particular child suffers headaches and nausea at school but feels good at home.<\/p>\n<p>Maxeen Jolin, the coordinator of communications services at the Sir-Wilfrid-Laurier school board, assured the Suburban that all necessary decontamination work was completed as of September 19, 2013.*<\/p>\n<p>This work is not registered as complete on the Quebec Environment\u2019s list of contaminated lands.<\/p>\n<p>H\u00e9l\u00e8ne Proteau, a spokesperson from the Minist\u00e8re du D\u00e9veloppement durable, de l\u2019Environnement, de la Faune et des Parcs (MDDEFP), said that the provincial database can\u2019t be updated until the ministry receives and verifies technical reports so that it can confirm\u00a0that the work has been done properly. That hasn\u2019t happened.<\/p>\n<blockquote><p>Sometimes it takes some time for the consultant to receive laboratory reports or other details that might be needed,\u201d she said. \u201cAs soon as the school board gets a satisfactory report from their consultant, they\u2019ll send it to us so that we can verify that the results conform to our requirements. If all that works out properly, then we\u2019ll report that the land has been rehabilitated on our records.\u201d<\/p><\/blockquote>\n<p>Proteau also provided more details about the work that was done.<\/p>\n<blockquote><p>We learned of this file in 2006,\u201d she said. \u201cThey removed much of the contaminated soil in 2006, but the work was so close to the building that to remove any more soil would require structural supports for because the foundation would not support the building on its own if they continued. That was in autumn. So the school board put other soil in the excavation until the final project could be completed. It took several years to do that work, but it was done in 2013.\u201d<\/p><\/blockquote>\n<p>When the Suburban told the Madame Proteau about the parent who complained, she suggested that any concerned parent should speak to the CLSC near the school to get support and ensure that proper tests are completed.<\/p>\n<p>Note: This article appeared on page 6 of the Laval edition of The Suburban yesterday.<\/p>\n<p>*This date appeared incorrectly in an earlier version.<\/p>\n<h1>Previous Story on\u00a0February 13, 2014:<\/h1>\n<h1>Crestview Elementary School Decontaminated<\/h1>\n<p><span style=\"font-size: 14px; line-height: 1.5em;\">Parents at Crestview Elementary in Laval were told little about the big decontamination project in their schoolyard until a construction strike delayed the work.<\/span><\/p>\n<p>After winning the tender that went out on May 27, 2013, Les Paysagistes Damiano Inc. was supposed to finish the million dollar job before school restarted at the end of August.<\/p>\n<p>That didn\u2019t happen. Parents were told that the school wouldn\u2019t be able to open on time by phone and via letter from governing board chair Paul Leal in early August.<\/p>\n<p>\u201cAs you know, the school yard at Crestview has been going through the decontamination process over the summer months and we have been getting regular updates on the work being done,\u201d he wrote. \u201cMost of the updates have been positive and on schedule. However, the last update wasn\u2019t so positive as the decontamination process has hit a few snags, particularly with the depth in which the oil has spread. Another factor that has added additional delays to the work being done was the heavy rains we recently had, complicating the decontamination process even further.\u201d<\/p>\n<p>Leal\u2019s letter doesn\u2019t mention the construction strike that school board commissioners were told was the reason for the delay at their August meeting.<\/p>\n<p>Instead of beginning at Crestview in August, 247 children were transported daily to Phoenix Alternative Elementary School. Crestview reopened on September 23.<\/p>\n<p>This isn\u2019t the first time that environmental dangers have forced Crestview Elementary School to be cleaned up.<\/p>\n<p>An oil tank was due to be replaced in the summer of 2006, and that project got delayed a full year after an unusually-large oil leak was discovered. The same project also found contaminated soil on the grounds of Our Lady of Peace Elementary School, but it was minimal enough to be removed as soon as it was found.<\/p>\n<p>The Crestview oil tank couldn\u2019t be repaired until after Wilfrid Laurier School board officials approved the engagement of Gestenv on October 25, 2006. That $72,982.72 contract covered replacing the leaking oil tank, disposing of the contaminated soil beneath, backfilling and excavating.<\/p>\n<p>In 1999, the school board hired Isolation Algon\u00a0to remove friable asbestos from the building for $71,586.41.<\/p>\n<p>Last summer\u2019s decontamination and repaving cost more than ten times as much as either of those contracts\u2014a total of $1,057,068.19 with tax.<\/p>\n<p>That\u2019s one third of the entire worth of the property according to Laval\u2019s tax rolls. The circa-1963 two-storey building at 750 Avenue du Devonshire is worth $1.7 million. The lot it sits on\u2014number 1189782\u2014measures 1,098,130 square metres and is evaluated at $1.4 million for a total property worth of $3.1 million.<\/p>\n<p>Approval of this latest clean-up also went through an altogether different process than what occurred in either 2006 or 1999. This time the decision was included within a three-year capital expenditure resolution (#CC-130626-MR-0192), which was approved last May. According to those minutes, Quebec\u2019s ministry of education (Minist\u00e8re de l\u2019\u00c9ducation, du Loisir et du Sport) and the Sir Wilfrid Laurier School Board approved the amount under Quebec\u2019s \u201cpassif environnemental\u201d law, which normally is used to rehabilitate old mining sites.<\/p>\n<p>Crestview does appear on a list of contaminated lands maintained by Quebec\u2019s environment ministry. It is one of two schools in Laval on which cleanups are identified as \u201cnot completed.\u201d<\/p>\n<p>According to that site, the Crestview property is contaminated with polycyclic aromatic hydrocarbons in addition to petroleum hydrocarbons C10 to C50. Hydrocarbons usually contain benzene, which is known to cause cancer in humans. Aromatic hydrocarbons are considered risky too because they can be absorbed through the skin or by breathing in addition to taking them in through the digestive system. Buildings located on or near hydrocarbon deposits are at risk for something known as \u201cvapour intrusion,\u201d in which airborne toxins infiltrate the premises causing breathing difficulties, fainting and headaches.<\/p>\n<p>The other \u201cnot completed\u201d rehabilitation is located at College Laurier. That site is contaminated with heavy metals.<\/p>\n<p>Leblanc Secondary School, St-G\u00e9rard, Coll\u00e8ge Laval, the Garderie Brins d&#8217;\u00c9veil, Le Virage and the Le Virage Annexe, Notre-Dame-de-Pontmain, Ste-C\u00e9cile, Ste-Marguerite, both St-Gilles pavilions, St-Norbert and four Commission scolaire de Laval buildings (956 mont\u00e9e Gravel,\u00a0 3730 boul. L\u00e9vesque Ouest, 475 66e Avenue and 800, place Sauv\u00e9 Laval) are all on the list too, but they were cleaned up in 2001 and 2002.<\/p>\n<p>Our Lady of Peace Elementary School is not listed on the ministry site, which can be found at <a href=\"http:\/\/www.mddep.gouv.qc.ca\/sol\/terrains\/terrains-contamines\">http:\/\/www.mddep.gouv.qc.ca\/sol\/terrains\/terrains-contamines<\/a>.<\/p>\n<p>Note: This article appeared on page one of the Laval edition of the Suburban yesterday.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After reading about the damaged heating tank and the decontamination at Crestview last summer, someone with a child at the school contacted the Suburban to ask whether the school is safe. This particular child suffers headaches and nausea at school but feels good at home. Maxeen Jolin, the coordinator of communications services at the Sir-Wilfrid-Laurier [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_wp_convertkit_post_meta":{"form":"-1","landing_page":"0","tag":"0","restrict_content":"0"},"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[20,6],"tags":[135,139,136,140,138,141,137],"class_list":["post-15528","post","type-post","status-publish","format-standard","hentry","category-hundredmilecircle","category-seasonal-living","tag-crestview-elementary","tag-decontamination","tag-laval","tag-les-paysagistes-damiano-inc","tag-million-dollar","tag-school","tag-schoolyard","post-wrapper","thrv_wrapper"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2buQs-42s","jetpack-related-posts":[{"id":18717,"url":"https:\/\/traceyarial.com\/blog\/en\/last-week-march-2018-verdun\/","url_meta":{"origin":15528,"position":0},"title":"This week in Verdun: land decontamination possible, garbage contract cancelled, another good restaurant","author":"Tracey Arial","date":"March 26, 2018","format":false,"excerpt":"Verdun was in the news many times during the last week of March\u00a02018. Our political representatives made announcements about a program to help decontaminate soil and the cancellation of a garbage collection contract. Le Pigor got its first review and Promenade Wellington's annual sugar shack festival finished with record\u00a0crowds. Gaetan\u2026","rel":"","context":"In &quot;Verdun&quot;","block_context":{"text":"Verdun","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/verdunposts\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/IsabelleMelancon-1.png?fit=200%2C200&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1561,"url":"https:\/\/traceyarial.com\/blog\/en\/montrealombudsman_2012_report\/","url_meta":{"origin":15528,"position":1},"title":"Ombudsman saw more health and welfare complaints in 2012","author":"Tracey Arial","date":"March 27, 2013","format":false,"excerpt":"The ombudsman of Montreal received 79 complaints about unclean or unmaintained dwellings in 2012, a figure significantly higher than ever before. In 2011, the figure was 62, while in 2010, it was 42. \u201cThe healthiness of dwellings, in low rent housing and in private buildings, is also a topic which\u2026","rel":"","context":"In &quot;Island Report&quot;","block_context":{"text":"Island Report","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/island-report\/"},"img":{"alt_text":"Savard","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/Savard1.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2943,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalle-reacts-toxic-waste-lasalle\/","url_meta":{"origin":15528,"position":2},"title":"LaSalle Reacts: \u201cThere is no Toxic Waste in LaSalle\u201d","author":"Tracey Arial","date":"October 3, 2013","format":false,"excerpt":"The borough of LaSalle reacted quickly to reassure citizens that \u201cthere is no toxic waste in LaSalle.\u201d In a letter sent two days after our article appeared, Pierre Dupuis, the LaSalle borough\u2019s communications director and clerk wrote: Toxic waste is what you find in the numerous containers full of PCBs\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"2013-07-11 12.17.05","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05-600x450.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05-600x450.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05-600x450.jpg?resize=525%2C300 1.5x"},"classes":[]},{"id":2828,"url":"https:\/\/traceyarial.com\/blog\/en\/eq8_quartier_angrignon\/","url_meta":{"origin":15528,"position":3},"title":"Construction of two more Quartier Angrignon towers underway","author":"Tracey Arial","date":"August 20, 2013","format":false,"excerpt":"\u00a0 LaSalle Borough Councillors accepted $566,990 to establish a park on Allard Street at their July borough meeting. The payment is linked to the upcoming construction of two towers in Quartier Angrignon on a triangular lot bordered by Newman, Irwin and Allard. When completed, the two towers will form a\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"Quartier Angrignon","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/cholette-EQ8-144.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":19518,"url":"https:\/\/traceyarial.com\/blog\/en\/can-the-lachine-east-consultation-restore-trust\/","url_meta":{"origin":15528,"position":4},"title":"Can the Lachine East Consultation Restore Trust?","author":"Tracey Arial","date":"March 4, 2019","format":false,"excerpt":"Hundreds of people spent Sunday afternoon on February 24 talking about the 50- hectare plus Lachine East Development at the Maison du Brasseur. \u201cFinally we have the developers, government and citizens all in the same room,\u201d said Lachine Mayor Maja Vodanovic. \u201cNow we can create the neighbourhood of our dreams\u2026","rel":"","context":"In &quot;Island Report&quot;","block_context":{"text":"Island Report","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/island-report\/"},"img":{"alt_text":"Lachine East Open House","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20190224_131330.jpg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20190224_131330.jpg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20190224_131330.jpg?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20190224_131330.jpg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20190224_131330.jpg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2902,"url":"https:\/\/traceyarial.com\/blog\/en\/toxic-waste-in-lasalle\/","url_meta":{"origin":15528,"position":5},"title":"Is there toxic waste in LaSalle?","author":"Tracey Arial","date":"September 27, 2013","format":false,"excerpt":"LaSalle resident Joseph Pugliese spent the summer trying to figure out what\u2019s going on in the industrial land between Senkus, Irwin, Newman and Saint Patrick. The entire industrial region was once the site of a factory that turned coal into coke. It then became the centre of chemical manufacturing for\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05.jpg?resize=700%2C400 2x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05.jpg?resize=1050%2C600 3x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/2013-07-11-12.17.05.jpg?resize=1400%2C800 4x"},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/15528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/comments?post=15528"}],"version-history":[{"count":4,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/15528\/revisions"}],"predecessor-version":[{"id":15705,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/15528\/revisions\/15705"}],"wp:attachment":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/media?parent=15528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/categories?post=15528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/tags?post=15528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}