{"id":1228,"date":"2012-11-07T15:45:12","date_gmt":"2012-11-07T20:45:12","guid":{"rendered":"http:\/\/traceyarial.com\/blog\/?p=1228"},"modified":"2012-11-07T15:45:12","modified_gmt":"2012-11-07T20:45:12","slug":"merck-moving-across-the-street","status":"publish","type":"post","link":"https:\/\/traceyarial.com\/blog\/en\/merck-moving-across-the-street\/","title":{"rendered":"Merck Moving Across the Street"},"content":{"rendered":"<p><a href=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"1229\" data-permalink=\"https:\/\/traceyarial.com\/blog\/en\/merck-moving-across-the-street\/merckkirkland\/\" data-orig-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?fit=600%2C740&amp;ssl=1\" data-orig-size=\"600,740\" data-comments-opened=\"1\" data-image-meta=\"{&quot;credit&quot;:&quot;Broccolini&quot;,&quot;caption&quot;:&quot;The new multitenant building will have from 5 to 8 floors (CNW Group\/Broccolini)&quot;}\" data-image-title=\"MerckKirkland\" data-image-description=\"&lt;p&gt;The new multitenant building will have from 5 to 8 floors (CNW Group\/Broccolini)&lt;\/p&gt;\n\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?fit=486%2C600&amp;ssl=1\" class=\"aligncenter size-full wp-image-1229\" title=\"MerckKirkland\" src=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?resize=600%2C740\" alt=\"\" width=\"600\" height=\"740\" srcset=\"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?w=600&amp;ssl=1 600w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?resize=121%2C150&amp;ssl=1 121w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?resize=243%2C300&amp;ssl=1 243w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?resize=202%2C250&amp;ssl=1 202w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?resize=162%2C200&amp;ssl=1 162w, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/MerckKirkland.jpg?resize=77%2C96&amp;ssl=1 77w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>Merck Canada will be the major tenant of a new building that Broccolini plans to build in Kirkland on the service road just at the border between Kirkland and Pointe Claire by the end of 2013. The move is a result of continued restructuring after the merger of Merck Canada and Schering Plough, which was finalized in November 2009.<\/p>\n<p>\u201cThe purpose of the move is to provide Merck Canada with a work space that is better suited to our currents needs, including an environment that encourages more collaboration and integration across the divisions,\u201d said Sheila Murphy, who is in charge of communications for Merck Canada Inc. \u201cThe new location will bring Merck\u2019s human health, consumer care and animal health divisions under one roof.\u201d<\/p>\n<p>The new building will encompass the current 80,000 square foot building at 16750 Trans-Canada Highway, in which 122 people now work. Broccolini built the space especially for Schering-Plough in 2008 and the two companies signed a 15-year lease at that time. Broccolini\u2019s expansion will increase the size of the space to somewhere between 200,000 and 300,000 square feet, depending on the number of storeys built, which will be between five and eight. Merck will occupy 170,000 square feet of the total space.<\/p>\n<p>The 403 employees who now work at 16711 Trans-Canada Highway across the street are expected to move into the new space by late next year. The company put its 35-acre flagship site with 18 buildings encompassing 1,051,204 square feet up for sale last February.<\/p>\n<p>The 35 employees who work for the Animal Health division at 3535 Trans-Canada Highway in Pointe Claire will also move to the new site. That site currently houses the Merck Manufacturing division with 189 employees. They will not move.<\/p>\n<p>\u201cThe new building will achieve LEED Silver certification, adhering to the highest environmental standards,\u201d says a press release from Broccolini Construction. \u201cIn addition to the rejuvenation of the existing office spaces, tenants will also benefit from a brand new workspace. The two sections, which will form the new complex, will be joined by an atrium. The workplace will be enhanced by a full-service cafeteria, gym (featuring ultra-modern equipment and massotherapy rooms), and indoor parking. A large, windowed fa\u00e7ade will maximize natural light and increase employee productivity. Particular attention will be made to the outdoor spaces and landscaping. The heating and ventilation systems will allow for a greater level of energy efficiency. The project will also qualify for a tax rebate program. Together, these benefits translate to greater cost savings to the tenants for the operational costs of the complex.\u201d<\/p>\n<p>The development project is valued at $75 million.<\/p>\n<p>&nbsp;<\/p>\n<p>Note: This article appears on p11 of the Suburban West Island edition.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Merck Canada will be the major tenant of a new building that Broccolini plans to build in Kirkland on the service road just at the border between Kirkland and Pointe Claire by the end of 2013. The move is a result of continued restructuring after the merger of Merck Canada and Schering Plough, which was [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_wp_convertkit_post_meta":{"form":"-1","landing_page":"0","tag":"0","restrict_content":"0"},"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[21],"tags":[],"class_list":["post-1228","post","type-post","status-publish","format-standard","hentry","category-island-report","post-wrapper","thrv_wrapper"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2buQs-jO","jetpack-related-posts":[{"id":2601,"url":"https:\/\/traceyarial.com\/blog\/en\/lasalles-english-website\/","url_meta":{"origin":1228,"position":0},"title":"LaSalle\u2019s English Website Online Now","author":"Tracey Arial","date":"August 22, 2013","format":false,"excerpt":"The borough of LaSalle has launched a website that fully mirrors the official French borough site for English-speaking residents. We had to build it the same way we built the French site,\" said Pierre Dupuis, the borough\u2019s clerk and director of communications. \"We\u2019ve translated everything and now we\u2019re double- and\u2026","rel":"","context":"In &quot;LaSalle&quot;","block_context":{"text":"LaSalle","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/lasalleposts\/"},"img":{"alt_text":"LaSalle's English website","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/Englishwebsite.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":15662,"url":"https:\/\/traceyarial.com\/blog\/en\/vancouver-office-stalled\/","url_meta":{"origin":1228,"position":1},"title":"Office demand in Vancouver stalled","author":"Tracey Arial","date":"April 10, 2014","format":false,"excerpt":"There\u2019s a lot of excitement in the Vancouver market recently, primarily due to three big developments due to open next year. Still, the top expert in the market says there\u2019s now a lull. When three or four buildings came out of the ground, they got a lot of immediate take-up\u2026","rel":"","context":"In &quot;Canada&quot;","block_context":{"text":"Canada","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/"},"img":{"alt_text":"BartCorbett","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/BartCorbett.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1895,"url":"https:\/\/traceyarial.com\/blog\/en\/productivity-sustainability-efficiency\/","url_meta":{"origin":1228,"position":2},"title":"Future Emphasis: Productivity, Sustainability, Efficiency","author":"Tracey Arial","date":"November 29, 2012","format":false,"excerpt":"Increased Emphasis on Productivity, Sustainability and Efficiency in Coming Years \u201cReal estate merely houses the world around us and we need to be responsive to global changes,\u201d says Gary Whitelaw,\u00a0Bentall Kennedy's CEO Global uncertainty, what\u2019s happening in Europe and the slowdown in Asia is affecting real estate demand in Canada\u2026","rel":"","context":"In &quot;International&quot;","block_context":{"text":"International","link":"https:\/\/traceyarial.com\/blog\/en\/category\/international\/"},"img":{"alt_text":"Whitelaw headshot","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/GaryWhitelaw.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1258,"url":"https:\/\/traceyarial.com\/blog\/en\/leed-certified-buildings-montreal\/","url_meta":{"origin":1228,"position":3},"title":"133 LEED Certified Buildings in Montreal","author":"Tracey Arial","date":"January 25, 2021","format":false,"excerpt":"The number of properties on the island of Montreal that are publicly registered as LEED projects has increased from 172 in 2012 to 258 today. LEED councils certified half (131) of the completed projects so far, with 104 getting rates above standard. LEED stands for \u201cLeadership in Energy and Environmental\u2026","rel":"","context":"In &quot;Island Report&quot;","block_context":{"text":"Island Report","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/island-report\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20140925_C1346_PHOTO_FR_6005.jpg?fit=1200%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20140925_C1346_PHOTO_FR_6005.jpg?fit=1200%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20140925_C1346_PHOTO_FR_6005.jpg?fit=1200%2C400&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20140925_C1346_PHOTO_FR_6005.jpg?fit=1200%2C400&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/20140925_C1346_PHOTO_FR_6005.jpg?fit=1200%2C400&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":19673,"url":"https:\/\/traceyarial.com\/blog\/en\/charlotte-and-arthurs-war-time-wedding\/","url_meta":{"origin":1228,"position":4},"title":"Charlotte and Arthur\u2019s War-Time Wedding","author":"Tracey Arial","date":"May 29, 2019","format":false,"excerpt":"I never asked my great granny Charlotte about her wedding, but the records I\u2019ve found hint at lots of intrigue. Did they plan a summer wedding and then rush things to avoid conscription? Had they initially hoped to marry in the church next to her home but lost the opportunity\u2026","rel":"","context":"In &quot;Genealogy Ensemble&quot;","block_context":{"text":"Genealogy Ensemble","link":"https:\/\/traceyarial.com\/blog\/en\/category\/history-worth-remembering\/genealogy-ensemble-history-worth-remembering\/"},"img":{"alt_text":"Charlotte, Arthur and Evelyn","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/CharlotteArthurEvelyn.jpg?fit=1200%2C821&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/CharlotteArthurEvelyn.jpg?fit=1200%2C821&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/CharlotteArthurEvelyn.jpg?fit=1200%2C821&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/CharlotteArthurEvelyn.jpg?fit=1200%2C821&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/CharlotteArthurEvelyn.jpg?fit=1200%2C821&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":15882,"url":"https:\/\/traceyarial.com\/blog\/en\/social-housing-struggle\/","url_meta":{"origin":1228,"position":5},"title":"The struggle to create safe clean social housing in Quebec","author":"Tracey Arial","date":"February 3, 2018","format":false,"excerpt":"Four years ago, Verdun borough mayor Jean-Fran\u00e7ois Parenteau agreed to build social housing on a municipally-owned lot on Gaetan Laberge instead of a larger project containing both condos and social housing. It isn't built yet in part because the land in question has to be decontaminated before residential units can\u2026","rel":"","context":"In &quot;Island Report&quot;","block_context":{"text":"Island Report","link":"https:\/\/traceyarial.com\/blog\/en\/category\/canada\/island-report\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/traceyarial.com\/blog\/wp-content\/uploads\/760chuteAug2011.jpg?fit=300%2C225&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/1228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/comments?post=1228"}],"version-history":[{"count":0,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/posts\/1228\/revisions"}],"wp:attachment":[{"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/media?parent=1228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/categories?post=1228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/traceyarial.com\/blog\/wp-json\/wp\/v2\/tags?post=1228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}